Skip to content

Price loops, calibration and terminations from one book.

Instrument cable by the metre, terminations and loop checks as standard actions with their crews, and confined-space and elevated factors - so a C&I scope is consistent whoever builds it.

Free plan, no card. Built for plant, mine and factory work.

Sound familiar?

Loop and termination counts get fuzzy

The labour to terminate, glue-and-gland and loop-check dozens of instruments is estimated in bulk instead of built up.

Specialist rates vary by estimator

Instrument-tech time is priced differently across the team, so the same scope lands at different numbers.

Committee buyers query the detail

Plant C&I buyers want the make-up of the number, and a spreadsheet total doesn't answer them.

Your C&I catalogue, built once

Instrument cable, terminations and loop work, priced consistently across the team.

The Products page of a Quotier catalogue: each product's category, cost and sell price per unit, crew and options
The products catalogue: every product's category, cost and sell price per unit, and the options and variants it comes in - set once, picked on every quote.
Instrument cable per metre
Multicore and single-pair cable carry cost and markup, priced per metre and multiplied by the run on each line.
Terminations & loop checks as actions
Terminate, gland, loop-check saved as standard actions with their instrument-tech crews: the labour lines seed themselves.
Confined-space & elevated factors
Difficulty levels for confined-space and elevated work scale the labour consistently across the scope.
A number the buyer can read
A branded PDF lays out lines, labour and products to the cent - the make-up a plant buyer expects to see.

After the loop list is priced

C&I work is checked instrument by instrument; the record can be too.

Time

Loop checks on the clock

Attribute hours to the loop-check line itself, so quoted-versus-actual reads per line, not only per trade.

Certificates

Calibration certificates by job

Logged against the job with their dates - recorded, not generated.

Quote

Zero-rated when your accountant says so

Classify a supply as zero-rated on the quote; the invoice prints VAT @ 0% and the VAT201 working paper shows it in its own box.

Instrumentation estimating - common questions

Can I price instrument cable per metre?

Yes. Instrument cable is a product with cost, purchase length and markup; the per-metre selling price is calculated and applied by the run on each line.

Can estimators be stopped from changing specialist rates?

Yes. Only owners and admins set the price book. Estimators quote from it; any line override to sharpen a price is allowed and visibly flagged, so specialist rates stay consistent.

Does the client accept the quote in the tool?

No. They open a branded PDF from a link and you see when they first open it; you record acceptance against the client's order number. The number's make-up is on the PDF for their review.

Price your next instrumentation job from one book.

Book a demo on your own kind of work, or start free with 15 quotes a month: no card, not a trial.